Separate occasional splashes from sustained wetting
A splash near a sink presents a different brief from a room washed down during every shift. Describe the frequency, temperature and substances involved, including cleaning products. Mark where water collects and how it is removed rather than describing the whole room simply as wet.
Explain whether the space also includes a dry customer or storage area. That boundary may affect the coating choice, texture and transition detail. A decorative finish chosen for the dry portion should not automatically become the specification for the working area.
Inspect drainage and equipment interfaces
Identify drains, equipment feet, wall junctions and door thresholds during assessment. Note persistent pooling, leakage or damaged concrete around them. A coating does not by itself redirect water or correct an unsuitable slope; any needed building or drainage work must be addressed separately.
Clarify which fixtures can be moved and who will disconnect or reinstall them. Hidden concrete beneath equipment needs an assessment plan. Agree on the edges and termination details so the finished surface does not stop at an unexpected line.
Make texture and cleaning compatible
Discuss the proposed surface with the people who will clean it. Share the brushes, mops or machines available and the debris that must be removed. Texture should be considered with actual exposure and housekeeping; no coating makes a wet workplace slip-proof.
Quartz or urethane cement systems may merit discussion depending on the conditions, but suitability needs review for the specific product and substrate. Provide any facility requirements rather than relying on a general product category to demonstrate compliance.
Include the first wash in the reopening plan
Work cannot be planned around foot traffic alone if cleaning or equipment operation exposes the new surface to water and chemicals. Confirm separate milestones for setup, normal use and the first cleaning. Arrange temporary operations or closure so those requirements can be followed without pressure to restart prematurely.
