Identify what stays before deciding what comes out
Mark retained door frames, wall finishes, built-in counters and adjoining flooring on the plan. Explain whether they are fixed project requirements or still under review. Preparation and edge details need to respect the agreed boundaries rather than being improvised once demolition begins.
If the property has special preservation, lease or alteration requirements, provide them to the responsible professionals. A flooring choice does not authorize changes to the building. Confirm which decisions belong to the owner, designer or other authority before scheduling permanent work.
Investigate existing layers and repairs
An older fit-out may conceal paint, adhesive, patches or changes in concrete height. Share available material records and identify anything that needs separate investigation before disturbance. The estimate should distinguish known preparation from conditions that cannot yet be inspected.
Photograph the exposed slab after removal work and before it is covered by new fixtures. Note cracks, damaged edges and moisture concerns. Agree how newly discovered conditions will be evaluated and who approves additional work so the next trade is not working from an outdated scope.
Plan the handover between trades
If another contractor removes flooring or installs partitions, specify the condition and access expected for the coating work. Confirm that utilities and the planned preparation area will be available. Keep future penetrations, threshold changes and heavy deliveries on the same schedule.
- Show where the coating stops beside retained materials.
- Identify areas that new fixtures would make inaccessible.
- Assign responsibility for moving and protecting retained items.
- Confirm when other trades may return after the coating is installed.
Select the finish after the boundaries are clear
Solid color or metallic resin may provide different design directions for a suitable interior. Review them against the actual use, cleaning and substrate rather than selecting solely to resemble an existing finish. Retain samples, scope decisions and care instructions so the renovated room has a clear record for future maintenance.
